Federal sites in the cloud: FedRAMP, DoD impact levels and recovery

Two claims about cloud hosting for federal sites come up often. One is that a platform like Azure helps you meet Section 508, the 21st Century IDEA Act and the Risk Management Framework. It does not: a cloud platform does not make your site accessible or authorize your system. The other is that Azure holds FedRAMP P-ATOs from the Joint Authorization Board (JAB). That was the language before the FedRAMP reforms, and it is now out of date.

FedRAMP in October 2026

OMB Memorandum M-24-15, published July 25, 2024, rescinded the Federal CIO’s December 8, 2011 memo that set FedRAMP policy and replaced it with “an updated vision, scope, and governance structure for FedRAMP” (M-24-15).

The JAB path ended with that change. The memo describes the JAB P-ATO as “used under the prior FedRAMP policy structure” and says existing JAB P-ATOs “will be re-designated” (M-24-15). GSA had announced in May 2024 that a new FedRAMP Board would replace the JAB (GSA). In August 2024 FedRAMP said “all authorized CSPs will be considered FedRAMP Authorized, regardless of path” (FedRAMP).

A JAB P-ATO is no longer a path you can start. The Marketplace still shows “JAB” in the Path field for services authorized that way, Azure among them (Marketplace).

The words changed too. The status is now “FedRAMP Certified”, with “FedRAMP Authorized” listed as an alias. FedRAMP now runs two processes side by side (FedRAMP definitions):

FedRAMP’s October 8 FY26 update reports 92 new certifications (66 Rev5 and 26 20x), 538 certified offerings at year end, 71 Initial Implementation listings and 760 new agency ATOs or ATUs. Its FY27 goals include adding Class D to 20x and beginning the Rev5 transition; FedRAMP expects to publish clear transition paths by the end of FY27. It also reports 40 applications through the limited Lost Sponsor and Ready Conversion pathways as of that update (FY26 report).

  • Rev5 “follows a legacy approach based primarily on documented plans.”
  • 20x “follows a modern approach based primarily on measured outcomes.” GSA announced it in March 2025 (FedRAMP 20x).

Certifications are grouped into classes, “increasing from minimal assurance at Class A to significant assurance at Class D.” The older impact levels still apply underneath: Low, Moderate and High (FedRAMP definitions). 20x initially supports Class A (Pilot), Class B (Low) and Class C (Moderate), with a Class D (High) pilot planned (FedRAMP 20x).

The dates to plan around, from the 2026 timeline: FedRAMP Ready went legacy on July 28, 2026. The 20x Class B and C pipeline opened on August 31, 2026. Adoption of the consolidated rules is mandatory from January 1, 2027, and new Rev5 certifications end on June 11, 2027. The end date for existing Rev5 certifications “has not been finalized but is likely to be no later than 2029” (FedRAMP notice).

A FedRAMP listing is not your ATO

The agency still makes its own decision. M-24-15 says agency authorizing officials “must issue an authorization when reusing artifacts” from the FedRAMP repository (M-24-15), and tells agencies to reuse other agencies’ authorization materials there as far as possible (M-24-15 roles).

Microsoft says the same about Azure: you can use its FedRAMP High authorization as the foundation for a program that needs an agency ATO, but “you need to achieve your own authorizations for components outside these services” (Microsoft Learn). Its shared responsibility table puts your data, configuration and user identities on your side in IaaS, PaaS and SaaS alike (Microsoft Learn, page dated 2026-08-24).

For a website that means your content management system, its plugins, your code, your admin accounts and your configuration are inside your system boundary and your ATO package.

DoD impact levels

DISA’s Cloud Computing Security Requirements Guide (SRG) sets the baseline for granting a cloud offering a DoD provisional authorization (PA) (Microsoft Learn: IL2). The levels, as Microsoft summarizes them:

  • IL2: information cleared for public release and some low confidentiality unclassified information that is not CUI. It may be hosted in an offering with at least a FedRAMP Moderate provisional authorization (Microsoft Learn: IL2).
  • IL4: CUI, non-critical mission information and non-national security systems. FedRAMP High is accepted without extra controls, but the SRG’s other requirements are still assessed (Microsoft Learn: IL4).
  • IL5: CUI that needs more protection than IL4, and national security systems (Microsoft Learn: IL5).
  • IL6: “At this time, only information classified as SECRET … is applicable to Impact Level 6” (DISA Cloud Connection Process Guide).

The authorizing official picks the level. Whether data fits IL5 “is up to the authorizing official responsible for categorizing the information and choosing the cloud impact level” (Microsoft Learn: IL5).

The PA is for the cloud offering. Your system still needs its own ATO: under DISA’s Cloud Connection Process Guide (December 2025), the Component AO issues it before the mission owner registers the project. An IL2 project needs no CPTC because its connection does not go through a DoD CIO-approved cloud access point (DISA).

In plain terms: a public DoD website with only public information usually sits at IL2 and reaches users over the internet. Once the site stores CUI, such as personnel or health records, the level and the connection rules change.

What Azure and Azure Government hold

Checked 16 October 2026. Microsoft’s IL2, IL4 and IL5 pages still describe Azure’s FedRAMP status in pre-2024 terms (a JAB P-ATO), so each source carries its own date.

OfferingFedRAMPDoDSource and its date
Azure (commercial, all US public regions)Certified, Rev5, Class D (High), path shown as JABIL2 PAFedRAMP Marketplace F1209051525 (Certified Since 5/3/2019); Microsoft Learn IL2 page (dated 2023-04-04, updated 2024-10-10)
Azure Government: US Gov Arizona, US Gov Texas, US Gov VirginiaCertified, Rev5, Class D (High), path shown as JABIL2, IL4 and IL5 PAsFedRAMP Marketplace F1603087869 (Certified Since 4/29/2020); Microsoft Learn IL4 and IL5 pages (dated 2023-04-04, updated 2024-10-10)
Azure Government: US DoD Central, US DoD East (DoD only)Not checked hereIL5 PA, separate from the US Gov regions’ PAMicrosoft Learn Azure Government DoD overview (dated 2024-08-15, updated 2025-09-08)
Azure Government SecretNot checked hereUsed for IL6 data (classified up to Secret); the page names no IL6 PAMicrosoft Learn Azure Government DoD overview (dated 2024-08-15, updated 2025-09-08)

The FedRAMP rows match the Marketplace listings on 16 October 2026. The DoD rows rest on Microsoft’s pages as last updated; we did not check them against a DISA list. Before you put any of this in a package, check the Marketplace listing, the DoD PA and the service’s audit scope on the day you write it.

Recovery is your design decision

NIST SP 800-34 Rev. 1, Contingency Planning Guide for Federal Information Systems, is still current; NIST lists no newer revision (NIST CSRC). Its three numbers are worth agreeing on before you pick an architecture (SP 800-34 Rev. 1):

  • Maximum tolerable downtime (MTD): the total outage time the system owner or authorizing official is willing to accept.
  • Recovery time objective (RTO): how long a system resource can stay unavailable before the impact is unacceptable. It “must normally be shorter than the MTD.”
  • Recovery point objective (RPO): the point in time, before the outage, to which data can be recovered from the most recent backup. It reflects how much data loss the mission can tolerate.

In Azure, Microsoft “is solely responsible for core platform reliability.” Availability zones, multiple regions, service tiers and backups are there, but “you’re entirely responsible for selecting and using the appropriate ones for your needs.” On backups: “You’re responsible for verifying whether backups are enabled and for configuring them appropriately” (Microsoft Learn, page dated 2025-11-13).

For an authorized system that limits your choices. A second region only helps if the services you use are in scope there. In Azure Government, the IL5 service list for the US DoD regions is shorter than for the US Gov regions (Microsoft Learn).

What we would write down for a website before building: the RTO and RPO the system owner agreed to, where backups live and who restores them, which region is the fallback and whether every service is authorized there, and when the last restore test ran.

What we have done

Our public work register lists web sustainment, Drupal, FedRAMP cloud hosting and Section 508 reporting for a DoD agency (prime, 2021 to 2026). It also lists help desk, desktop, data center, VMware, SAN and network support, on site, for a Navy medical command (prime, 2021 to 2026), and architecture, sustainment and modernization, and ATO support for a Navy medical portal program (subcontractor, 2009 to 2012).

Sources

  1. OMB Memorandum M-24-15 (PDF, hosted by FedRAMP)
  2. FedRAMP: OMB Memorandum M-24-15
  3. FedRAMP: M-24-15 roles
  4. GSA: FedRAMP Board launched (May 2024)
  5. FedRAMP: Moving to one FedRAMP authorization (August 2024)
  6. FedRAMP: 2026 definitions
  7. FedRAMP: 20x
  8. FedRAMP: Consolidated Rules for 2026 timeline
  9. FedRAMP: Notice on 20x and Rev5
  10. FedRAMP Marketplace: Azure Commercial Cloud
  11. FedRAMP Marketplace: Azure Government
  12. Microsoft Learn: Azure FedRAMP offering
  13. Microsoft Learn: Shared responsibility in the cloud
  14. Microsoft Learn: DoD Impact Level 2
  15. Microsoft Learn: DoD Impact Level 4
  16. Microsoft Learn: DoD Impact Level 5
  17. Microsoft Learn: Azure Government for DoD
  18. DISA: DoD Cloud Connection Process Guide (December 2025)
  19. NIST: SP 800-34 Rev. 1 publication page
  20. NIST: SP 800-34 Rev. 1 (PDF)
  21. Microsoft Learn: Shared responsibility for reliability
  22. FedRAMP: FY26 year in review and FY27 goals (October 8, 2026)
  23. DISA: Current Authorized Cloud Service Offerings